Project Name

Client

Firms Responsibility

Funding Agency

preparation of Detailed Architectural & Structural Design, Drawing, Cost Estimate, Bid Document and Permanent Supervision for Construction of Flyover at Bahaddarhat Junction, Chittagong.

Chittagong Development Authority (CDA)

Prepare Planning, structural Design and Drawing for construction of the Flyover including retaining wall, abutment wall and other secondary bridge and culverts necessary along the road, soil stabilization and all other necessary work related to this and Prepare Detail Architecture Drawing (Plan, Elevation, Section, 3D-perspective view, etc.) also Preparation of Pre-qualification Document and Contractor Bidding Document.

GOB

Dhaka Urban Transport Project (DUTP)

Greater Dhaka Transport Planning and Coordination Board (GDTPCB),Ministry of Communications, GOB.

To design, where appropriate and supervise implementation of a range of infrastructure component such as a)Intersection Improvement b)Arterial Road Improvement, c)Parking Facilities, d)Implementation of auto restricted zone, e)Major Grade Separation Structures : This component involves construction Supervision of Mohakhali and Jatrabari flyovers.

IDA

Conducting detailed design for Railway Overpass and Poad Connection between Bijoy Sarani and Tejgaon Industrial Area

RAJUK

Survey, investigation ,Detailed Engineering Design & Full time Construction Supervision of Railway overpass over the link Road Connection between Bijoy Sarani and tejgaon Industrial Area.

GOB

Detail Design, Supervision and Monitoring for the Construction of Roads, seven nos. Overpasss (flyovers) , Bridges/ Culverts of Purbachal Link Road (Deborgam-Progoti Sharani Construction Project.

RAJUK

Purbachal Link Road Project is a 30 Km long expressway, from the Nikunja (Kuril Intersection to  Kanchan Bridre over the Sitalakhya River at the east to the Dhaka -Sylhet Highway.

GOB

Feasibility Study for Conversion/ Construction of Dhaka-Chittagong Railway Line into Double rack With Electrric Traction

Bangladesh Railway

Feasibility study for ‑construction of double track on the existing single line segments on Dhaka‑Chittagong section of BR and introduction of electric traction. over the entire double line route between Dhaka and Chittagong, construction of new single track Metre Gauge (MG) railway line from Laksam to Dhaka for shorter railway link between Dhaka and Chittagong.

GOB

Consultancy Services for Dhaka Elevated Expressway PPP project, Dhaka.

Bangladesh Bridge Authority (BBA)

Review available documents, maps, aerial photographs and previous transport study reports. Identify key utilities affected by the proposed Elevated Expressway. Review available documents, including the Strategic Transport Plan for Dhaka. Undertake traffic counts and traffic conditions surveys. Depending on accessibility of survey locations, and co-operation from authorities to stop traffic to conduct surveys, undertake. Evaluate trip duration (travel times) along selected routes during the peak and off-peak periods

GOB